CeBIT Global Conferences

On behalf of and in co-operation with Deutsche Messe AG and Fair Solution, we have realized the trade fair stand construction at the CeBIT Global Conferences 2017 in Hall 8. These included more than 2500 m² of wall textile coverings, approx. 350 m of wall construction, as well as various carpentry work in the area of the three stage areas – covering a total area of approx. 5,000 m².

We thank you for the good cooperation.

www.cebit.de